Estrella Tower Reaches Its Final Downtown Design Review in Columbus
Columbus's Downtown Commission reviewed the 25-story Estrella tower's final design at 199 E. Rich St. on Nov. 17, 2026; trade coverage reported it was approved.

Columbus's Downtown Commission took up the final design for the Estrella, a mixed-use tower planned at 199 East Rich Street, on November 17; Columbus Business First reported the panel signed off. The city's own record of that vote is not yet posted, but the hearing marks the project's last major design review before it can seek permits.
From a conceptual look to a full design vote
The Estrella returned to the Downtown Commission's November 17 agenda as a new application for a certificate of appropriateness covering new construction and landscaping — the design sign-off a downtown project must win before it can apply for demolition or building permits. The owner is listed as Rico 199 LLC and the applicant as architect Berardi + Partners. That is a step beyond the conceptual review the same tower received a few weeks earlier, when the commission offered feedback but took no binding vote.
The Colliers Columbus weekly review published November 20 reported, citing a November 17 Columbus Business First story, that the 25-story tower “received the stamp of final approval.” Business First sits behind a paywall, and the commission has not yet posted its official record of action for the November 17 meeting, so the exact motion, any conditions and the vote count are not yet in a public record CREN could read.
What the commission asked for in October
The city's record of action for the October 27 hearing shows the Estrella appearing that day as a conceptual application. Joe Berardi and JT McManus of Berardi + Partners presented alongside owner Stanley Lan. The commission “responded positively to the changes that were presented” and recommended that the team keep developing artwork for the blank Fourth Street façade and study exposing an existing brick wall. A conceptual review of this kind gathers direction rather than issuing an approval, which is why the project returned in November for the binding certificate.
The money the state already put behind it
The Estrella's core numbers were set almost two years ago. On January 27, 2025, the Ohio Department of Development awarded the project a $4.5 million Transformational Mixed-Use Development tax credit — a state credit for large mixed-use buildings that are expected to generate enough new tax revenue to help finance themselves. The state's award record described a 24-story, 503,103-square-foot tower at 175–199 Rich Street with a total development cost of $122.6 million, a fresh-food grocery store meant to serve a downtown food desert, and an estimated 1,239 construction jobs and 808 permanent jobs.
A tower whose size keeps shifting
How big the Estrella will be is the detail that keeps moving. The state's 2025 award lists 24 stories; the application the architect filed in September 2026 describes a 25-story building, the figure both Business First and CREN's October coverage used. Unit counts diverge too: the September filing lists 296 apartments, while Bluestone Brothers' own project page still shows 290, and earlier 2026 reports put the number near 252. The November 17 agenda names no unit count, and no public record CREN reviewed this run fixes the final, approved figure.
What is verified, and what is not
Two things are solid from the city's own records: the commission heard the Estrella as a full certificate-of-appropriateness case on November 17, and it had given the design encouraging but non-binding feedback on October 27. The approval itself rests on Business First's reporting, relayed through the Colliers roundup, until the commission posts its record of action — a document it is due to adopt at its December 15 hearing. The developer's stated plan to begin construction in 2027, carried in the same trade coverage, is a projection by Bluestone, not a permitted schedule.
What to watch next
The clearest next markers are public and dated: the Downtown Commission's record of action for November 17, which should state the exact motion and any conditions; any demolition and building permit applications filed for 175–199 East Rich Street; and whether the developer names the grocery operator the state award has promised since 2025.
Looking for a place to rent?
Tell us your budget and the areas you like. We send you Columbus rentals that fit what you can actually spend. Renters pay us nothing.
Find a rental